TheatreBear Pit Theatre

This was an incredibly intricate job carried out whereby an existing and much smaller theatre seating raking system was removed and made good by installing a new system. The works included a large amount of planning with regards to specific calculations etc. Being a tiered system and on an existing floor each piece of steel deck required each aluminium or steel leg to be a different and specific length. Knights Events also took on the responsibility of sourcing various materials including materials needed from steel fabricators. With some cutting being made onsite, specific crew were on hand with various tools such as chop saws specific to metal cutting. Following the completion of the tiered system railings and theatre seats were installed as well as a tech desk area spanning the full width of the tiered seating system.

Who we work with

  • Compton Verney Slv Events Universal Live
  • Vortex Creates Birmingham Royal Ballet Warwick Arts Center
  • Evolution Dome Coventry Cathedral CPL Enhanced Technology
  • Clearsound Productions Yellow Bus Events Bear Pit Theatre
  • Birmingham Hippodrome Commbus Complete Staging Ltd
  • Mustard Presentations Godiva Festival Deckerdence
  • Paul Mathew Transport Showman Event Support Wavelength Stageco ltd

Quick // Enquiries